129. The authorization holder must start the pipeline construction work not later than 12 months after obtaining the last authorization necessary or the favourable decision from the Régie de l’énergie. The authorization holder who plans on using a pipeline already built must start use it within 6 months.
The Minister may grant an additional period if the holder demonstrates the need therefor.